Tuesday, November 24, 2009

Final renovations post (almost)

The workers have all gone, except those we've subsequently hired to put in the back walkway, and the only thing we have left to do inside is have the built-ins installed (built in, I guess) in the mudroom the second week or so in December. Amazing. It's already a little hard to believe we ever lived without the changes, which I guess means that it all fits seemlessly. So here are some pictures:

Looking into the mudroom from the back hallway

 

Door to the garage

 

Facing the back door

 

Facing back into the house

 

New 2nd floor new bedroom (also known as the Cleveland Browns room), facing in from the hallway

 

Turning counter clockwise


A little further counter clockwise (the long window looks over the garage)

 

Another turn, facing the same way as toward the backdoor in the mudroom

 

Looking back into the rest of the house
 

No comments:

Post a Comment